Detailed design of water and wastewater infrastructures in the Canaveses bridge area, for the municipality of Marco de Canaveses. The project includes the design of water supply and wastewater drainage networks, 2 wastewater pumping stations, a water supply rising main (350mm diameter) and a wastewater rising main (125mm diameter). The total approximate length of piping and networks is 6 km which includes the rising mains’ overhead crossing of the bridge.