Al Wukair PR-PS Pumping Station - Hydraulic and Septicity Modeling for Odour Control Unity (OCU) Design

Client
Location
Date
Metito Overseas Qatar / Ashghal
Doha, Qatar
2021

The work to be developed has a focus on consultancy in the areas of hydraulic and septicity modelling to support design of the works to be developed by Metito under the contract resulting from the tender of Al Wukair PR-PS Pumping Station.

The works will generically include:

• Creation of a hydraulic and septicity model to assess septicity and odour generation in the study area;

• Design criteria definition for the OCU to be implemented;

• Model update and design validation;

• Data collection support.

53

Metito Overseas Qatar / Ashghal

Doha, Qatar

Al Wukair PR-PS Pumping Station - Hydraulic and Septicity Modeling for Odour Control Unity (OCU) Design

53

Metito Overseas Qatar / Ashghal

Doha, Qatar

Al Wukair PR-PS Pumping Station - Hydraulic and Septicity Modeling for Odour Control Unity (OCU) Design

View all projects