The scope of the services to be provided comprised the following:
NETWORKS: Revision of the design of FFD water mains as well as HDPE (~ 1,450 m) and another water main in HDPE (~ 1,650 m);
WTP: Hydro-sanitary analysis of existing facility capacity; Definition of quality and quantity objectives for WTP expansion; Elaboration of the hydraulic-sanitary project for the expansion of WTP, as well as the other specialties;
WATER TANKS: Structural design and construction of the new north water tank and the new south water tank.