Detailed design for the following water infrastructures: Collection/ elevation near Douro River (30 l/s, Hman 300); Elevating main pipe with about 5 km in FFD DN 200; Pumping station / intermediate tank (30 l/s, Hman 250, vol 300 m3).
The project includes: Detailed Design Project, including landscape and environmental analysis; Health and Safety Plan and Technical Compilation; Elaboration of the Tender Process for launching the contract; Technical assistance; Construction and Demolition Waste Management Plan.