Detailed Design of the Valdosende Main Sewer

Client
Location
Date
Águas do Norte
Valdosende, Portugal
2016 - 2017

Detailed design of the Valdosende main sewer for Águas do Norte.

The main sewer will have a total length of 5.0 km and 4 intermediate pumping stations, due to the hilly terrain.

This project refers to a rural population of approximately 1’000 inhabitants.

18

Adjuris / LNEC

Angola

Angola Main Options on Territorial Planning (Water Infrastructures and Water Resources Management)

View project
Angola Main Options on Territorial Planning (Water Infrastructures and Water Resources Management)

25

Águas do Norte

Fafe, Portugal

Rehabilitation of the Lateral Spillway and Crowning Walls of the Queimadela’s Dam

View project
Rehabilitation of the Lateral Spillway and Crowning Walls of the Queimadela’s Dam
View all projects